Renovations, and Sustainable Upgrades
- daniel92029
- Sep 30, 2023
- 1 min read
It’s been an eventful period of updates and changes at Camp Mozumdar! Here’s a recap of recent progress and developments.
Remodeling the Manager’s Cabin Basement
With repairs to the water and gas lines in the basement complete, we’ve moved on to laying the new flooring. This work is expected to wrap up within a week, marking another step forward in creating a functional and comfortable space.

Replacing the Water Supply System
We’ve successfully installed a reliable and efficient water supply system after a bit of hard work:
The system automatically activates the booster pump when water pressure drops below 60 psi and shuts it off when pressure reaches a high point.
It’s simple, stable, and easy to maintain.
To protect the system, we’ve built a wooden shed that shields it from freezing temperatures in winter and sun damage in summer.
As always, we’re grateful for the ongoing support and interest in Camp Mozumdar’s growth. Stay tuned for more updates as we continue this journey of restoration and progress.
Warm regards,
The Camp Mozumdar Team
Comments